Drilling Management


Daily Drilling Record: The Drilling Operation software is used to record the daily drilling activities. It has various section to record the different aspects of drilling operations.

BHA Record: A complete record of the BHA used in a well for each section is recorded. This gives the complete information of the BHA for each day which can be compared with the type of well to be drilled.

Casing Record: The complete information of the type of the casing used recorded for each section of the well

Torque And Drag: A complete information of torque and drag of the BHA is recorded.

Pumping Record: A complete information of Mud pumps used on site for drilling is recorded for each drilling operation.

StandPipe Record: A complete stand pipe information is recorded for each cycle of drilling.

Survey Record: Each survey done at each subsequent stage of the drilling is recorded.

Drill Fluid Record: Drilling fluid information used at each drilling stage is recorded for the understanding of the drilling operation and the condition of the well.

Cementing Record: A complete information of the cementing activities in recorded for each of the well. This is used historically to understand the condition and health of the well.

Move Rig Record: The Rig and Camp move is an integral part of the Drilling Operation. The rig move operation along with the camp move is recorded based on the type of the route taken.